HDB flat · Bedok · East region
Chai Chee Green Renovation & Interior Design
Chai Chee Green is an HDB project in Bedok, in the Chai Chee part of the town. A third-party tracker estimate is on file, but this entry is not officially confirmed. HDB has not verified a project-wide completion or key month, and tracker sources have disagreed, so unit counts and any estimated month are left out of the facts below. If you already have a key appointment, that letter — not a website table — is the date that matters. This page sets out what is on file and how to plan your Chai Chee Green renovation.
Chai Chee Green at a glance
- Type
- HDB flat
- Developer
- HDB (listed in our project file, not officially confirmed)
- Area
- Bedok
- Region
- East
This project is not marked officially confirmed in our project file. Unit counts, tenure and completion or key dates from third-party trackers have been left blank until they can be cited from HDB.
Facts from the sources listed at the end of this page.
Planning your Chai Chee Green interior
Chai Chee is a settled residential pocket of Bedok rather than a brand-new waterfront. Owners here often want a calm, practical first fit-out: storage for shoes and bags, a kitchen that can take family cooking, and bedrooms that are fully fitted rather than left with a loose rack. Maison will design that work as built-in carpentry — fitted kitchen cabinets, full-height wardrobes, an entry cabinet, and a living-room joinery wall — and we can present it in a wide room view or in closer studies of a counter, a wardrobe or a headboard wall. We do not use flat-pack furniture as the backbone of the home, and we will not draw a layout until your approved plan is in hand.
No official floor plan is on file, so typologies and room sizes are not listed. Bedok North Springs is another near-completion HDB page in the same town; Bayshore Oasis and Bayshore Sails are much earlier BTO launches in Bedok and should not be used as a completion guide for Chai Chee Green. We will not invent walking times to Chai Chee, to Bedok town, or to any MRT station.
When keys are in writing, inspect defects first, then apply for the HDB renovation permit before any carpentry is fabricated. A moderate carpentry scope is often planned at six to ten weeks on site after approvals, as an editorial planning figure only. WhatsApp Maison with your approved plan and key letter if you have them. We are an independent designer and are not affiliated with HDB.
Planning your Chai Chee Green renovation
Defects check at handover
- Report defects within 30 days of key collection, before renovation starts (HDB move-in guide). The Defects Liability Period runs 1 year from key collection.
- Check floor and wall tiles for hollow or chipped pieces, plaster for cracks, and paint for stains.
- Test every door, window, lock, tap, floor trap, light point and power socket.
- Report through the QR code in your Welcome Kit or your project's Building Service Centre, with photos.
What the rules allow
- Use a contractor listed in HDB's Directory of Renovation Contractors; they can apply for the permit for you.
- A permit is needed for works such as removing floor finishes, raising floor levels in wet areas, or hacking or altering walls.
- For the first 3 years, toilet wall and floor finishes in a new BTO flat cannot be removed. New tiles can be overlaid.
- General works: Monday to Saturday, 9am to 6pm. Noisy works: Monday to Friday, 9am to 5pm. No works on Sundays or public holidays.
- Household shelter walls must not be hacked or drilled. Windows need a BCA-approved window contractor; air-conditioners need a BCA-trained installer.
Rules change, so we check the current version for your unit before we quote. Full bto key collection renovation guide
From keys to move-in
- 01
Before keys 4 to 8 weeks
Layout, 3D drawings and an itemised quotation, so work can start as soon as defects are reported.
- 02
Keys + first 2 weeks 1 to 2 weeks
Defects inspection and reporting, permit application, measurements on site.
- 03
Wet works and electrical 2 to 3 weeks
Tile overlays, screed or vinyl, wiring and plumbing points.
- 04
Carpentry 3 to 5 weeks
Built in the factory while wet works run on site, then installed.
- 05
Finishing 1 to 2 weeks
Painting, lights, glass, cleaning and a handover walk-through.
Chai Chee Green renovation FAQ
Is the completion or key date for Chai Chee Green confirmed?
Not in our project file. This project is not officially confirmed, so unit counts and tracker dates have been left blank. If you have an HDB key-appointment letter, use that.
Do you have the Chai Chee Green floor plan?
No official floor-plan or site image is on file for this page, so none is published here. Please send your approved HDB unit plan.
Do I need an HDB renovation permit?
Yes, for the usual HDB renovation works. After keys, inspect defects, then apply for the permit with a registered contractor before carpentry is fabricated.
What should I send Maison?
Your approved floor plan, unit type if you have it, and a key date if one is already in writing. WhatsApp us at https://wa.me/6593391185.
Sources
- hdbprices.com: 2027 (third-party, not used as official confirmation)
- HDB renovation guide
- HDB move-in guide
Facts checked against the sources on file, 11 November 2026.
Maison Interior Design is an independent interior design firm. We are not appointed by, or affiliated with, the developer, HDB or the building's owner. We have not worked at Chai Chee Green unless our portfolio says so. Concept pictures are AI-generated style concepts, not photos of a finished unit.
Talk to Maison
Planning your Chai Chee Green renovation?
WhatsApp Maison
WhatsApp Maison with your unit type, approved floor plan and key date (if you have one).