Private condominium · District 11 · Central region

Dunearn House Renovation & Interior Design

Dunearn House is a condominium in District 11, in the Novena, Dunearn and Shelford belt. Our project file records a launch in July 2026 from a third-party new-launch list. Because this entry is not officially confirmed, unit counts, tenure and that launch month are left out of the facts below, and no TOP or key date is confirmed. Please use the developer’s documents for completion, tenure and typologies. This page sets out what is on file and how to plan your Dunearn House renovation.

Dunearn House at a glance

Type
Private condominium
Area
District 11
Region
Central

This project is not marked officially confirmed in our project file. Unit counts, tenure and dates from third-party listings have been left blank until they can be cited from the developer, HDB or URA.

Facts from the sources listed at the end of this page.

Planning your Dunearn House interior

Dunearn Road is a long, established residential and institutional corridor rather than a brand-new waterfront. Owners here often already know the neighbourhood and want the new apartment to feel settled: a proper place for shoes and bags, a living room with a built-in storage wall, bedrooms with full-height wardrobes, and a kitchen that can take family cooking. A common bedroom is frequently asked to work as a study; a built-in desk and wardrobe along one wall is the usual, quieter answer. Maison specifies this as custom carpentry, not as loose, flat-pack furniture, and we will draw it from your approved plan, not from a generic District 11 layout.

No official floor plan is on file, so typologies and room sizes are not listed. Watten House on Shelford Road and The Serra Residences, also in District 11, are nearby pages on this site; they are not a substitute for your drawings. We will not invent a walking time to Novena, to Bukit Timah, or to any campus or hospital along the corridor. Check facing, traffic noise and the management rules on window and balcony treatments before you plan a bench, a desk under a window, or blinds.

When you have a key date in writing, leave time for defects inspection, measurement and renovation approval before carpentry is fabricated. A moderate, non-structural carpentry scope is often planned at about six to ten weeks on site after access and approvals — an editorial figure, not a promise. WhatsApp Maison with your plan and unit type. We are an independent designer and are not affiliated with the developer.

Planning your Dunearn House renovation

Defects check at handover

  • Your sale and purchase agreement sets the defects liability period, commonly 12 months from vacant possession. Check yours.
  • Inspect before your contractor starts, so new marks are not blamed on the renovation.
  • Check floors, walls, doors, windows, balcony glass, sealant, appliances, taps, water heater and air-conditioning.
  • Submit a list with photos through the developer's defects process and keep a copy.

What the rules allow

  • Renovation approval comes from the condo's management (the managing agent, then the MCST). Expect a form, a deposit and contractor registration.
  • Working hours are set by the condo's by-laws and are usually shorter than HDB's. Check them before booking work.
  • Changes seen from outside, such as balcony screens, grilles and the main door, need approval and must follow the approved design.
  • Structural changes need a professional engineer and building approvals.

Rules change, so we check the current version for your unit before we quote. Full new condo renovation guide

From keys to move-in

  1. 01

    Before keys 2 to 6 weeks

    Measurements from the floor plan, 3D drawings, quotation and the condo renovation application.

  2. 02

    Keys + defects 1 to 2 weeks

    Defects inspection and report, site measurements, MCST approval.

  3. 03

    Carpentry and electrical 3 to 4 weeks

    Built in the factory while lighting and power points are done on site.

  4. 04

    Install and finish 1 to 2 weeks

    Carpentry installation, curtains, lights and cleaning.

Dunearn House renovation FAQ

Is the completion or launch date for Dunearn House confirmed?

Not in our project file. This project is not officially confirmed, so unit counts, tenure and dates from third-party listings have been left blank. Use the developer’s documents for your own dates.

Do you have the Dunearn House floor plan?

No official floor-plan or site image is on file for this page, so none is published here. Please send your approved unit plan.

Can I renovate right after keys?

After handover, inspect defects and obtain the management corporation’s renovation approval first. A moderate carpentry scope is often planned at about six to ten weeks on site after access and approvals; that is an editorial allowance, not a guarantee.

What should I send Maison?

Your approved floor plan, unit type if you have it, and a key date if one is already in writing. WhatsApp us at https://wa.me/6593391185.

Sources

Facts checked against the sources on file, 11 November 2026.

Maison Interior Design is an independent interior design firm. We are not appointed by, or affiliated with, the developer, HDB or the building's owner. We have not worked at Dunearn House unless our portfolio says so. Concept pictures are AI-generated style concepts, not photos of a finished unit.

Talk to Maison

Planning your Dunearn House renovation?
WhatsApp Maison

WhatsApp Maison with your unit type, approved floor plan and key date (if you have one).