Garden Waterfront I & II @ Tengah Renovation & Interior Design

Garden Waterfront I & II @ Tengah is an HDB project in Tengah. The name records two parts, I and II, but we will not invent a typologies split or a phasing timetable between them. A third-party completion estimate is on file, but this entry is not officially confirmed: HDB has not verified a project-wide key date, and tracker sources have disagreed on the month. Unit counts and any estimated month are left out of the facts below. The words “Garden” and “Waterfront” are not treated as a confirmed outlook. If you have an HDB key letter, use that. This page sets out what is on file and how to plan your Garden Waterfront I & II @ Tengah renovation.

Garden Waterfront I & II @ Tengah at a glance

Type
HDB flat
Developer
HDB (listed in our project file, not officially confirmed)
Area
Tengah
Region
West

This project is not marked officially confirmed in our project file. Unit counts, tenure and completion or key dates from third-party trackers have been left blank until they can be cited from HDB.

Facts from the sources listed at the end of this page.

Planning your Garden Waterfront I & II @ Tengah interior

Tengah’s plantation and garden district is still taking shape, and a first fit-out here has to work from week one: a fitted kitchen, full-height wardrobes, an entry shoe cabinet, and a living-room storage wall, designed as built-in carpentry rather than as loose, flat-pack furniture. Maison can present that work in a wide room view or in closer material studies. We have no official floor plan on file and will not invent typologies, a typical layout, or a water view from your future block.

Plantation Creek @ Tengah and Plantation Verge are the other Tengah pages in this batch; both are also unconfirmed for keys. Keat Hong Grange and Heart of Yew Tee sit in neighbouring Choa Chu Kang. Use those as internal links, not as a shared typologies list or a shared handover date. We will not invent walking times to any present or future MRT station, and we will not treat the I and II label as two confirmed key dates.

After keys, inspect defects, measure, and apply for the HDB renovation permit before fabrication. A moderate, non-structural carpentry scope is often planned at about six to ten weeks on site after access and approvals — an editorial allowance, not a guarantee. WhatsApp Maison with your approved plan and any key letter you have. We are not affiliated with HDB.

Planning your Garden Waterfront I & II @ Tengah renovation

Defects check at handover

  • Report defects within 30 days of key collection, before renovation starts (HDB move-in guide). The Defects Liability Period runs 1 year from key collection.
  • Check floor and wall tiles for hollow or chipped pieces, plaster for cracks, and paint for stains.
  • Test every door, window, lock, tap, floor trap, light point and power socket.
  • Report through the QR code in your Welcome Kit or your project's Building Service Centre, with photos.

What the rules allow

  • Use a contractor listed in HDB's Directory of Renovation Contractors; they can apply for the permit for you.
  • A permit is needed for works such as removing floor finishes, raising floor levels in wet areas, or hacking or altering walls.
  • For the first 3 years, toilet wall and floor finishes in a new BTO flat cannot be removed. New tiles can be overlaid.
  • General works: Monday to Saturday, 9am to 6pm. Noisy works: Monday to Friday, 9am to 5pm. No works on Sundays or public holidays.
  • Household shelter walls must not be hacked or drilled. Windows need a BCA-approved window contractor; air-conditioners need a BCA-trained installer.

Rules change, so we check the current version for your unit before we quote. Full bto key collection renovation guide

From keys to move-in

  1. 01

    Before keys 4 to 8 weeks

    Layout, 3D drawings and an itemised quotation, so work can start as soon as defects are reported.

  2. 02

    Keys + first 2 weeks 1 to 2 weeks

    Defects inspection and reporting, permit application, measurements on site.

  3. 03

    Wet works and electrical 2 to 3 weeks

    Tile overlays, screed or vinyl, wiring and plumbing points.

  4. 04

    Carpentry 3 to 5 weeks

    Built in the factory while wet works run on site, then installed.

  5. 05

    Finishing 1 to 2 weeks

    Painting, lights, glass, cleaning and a handover walk-through.

Garden Waterfront I & II @ Tengah renovation FAQ

Is the completion or key date for Garden Waterfront I & II @ Tengah confirmed?

Not in our project file. This project is not officially confirmed, so unit counts and tracker dates have been left blank. If you have an HDB key-appointment letter, use that.

Do you have the Garden Waterfront I & II @ Tengah floor plan?

No official floor-plan or site image is on file for this page, so none is published here. Please send your approved HDB unit plan.

Do I need an HDB renovation permit?

Yes, for the usual HDB renovation works. After keys, inspect defects, then apply for the permit with a registered contractor before carpentry is fabricated.

What should I send Maison?

Your approved floor plan, unit type if you have it, and a key date if one is already in writing. WhatsApp us at https://wa.me/6593391185.

Sources

Facts checked against the sources on file, 11 November 2026.

Maison Interior Design is an independent interior design firm. We are not appointed by, or affiliated with, the developer, HDB or the building's owner. We have not worked at Garden Waterfront I & II @ Tengah unless our portfolio says so. Concept pictures are AI-generated style concepts, not photos of a finished unit.

Talk to Maison

Planning your Garden Waterfront I & II @ Tengah renovation?
WhatsApp Maison

WhatsApp Maison with your unit type, approved floor plan and key date (if you have one).