Office · CBD · Central region
IOI Central Boulevard Towers Fit-Out & Interior Design
IOI Central Boulevard Towers is an office development recorded in our project file with a listed address at Central Boulevard / Raffles Quay, and with IOI Properties named as the developer. This entry is not officially confirmed. The file notes 2026 leasing activity and a 2024 TOP, and it is explicit that this is not a new 2026 TOP. Reported occupiers and exact relocation dates are unconfirmed in the file, so those names and dates are left out of the facts below, as are unit counts and tenure. If you are a tenant, use your lease and the landlord’s handover documents, not a news list, for your own access date. This page sets out what is on file and how to plan your IOI Central Boulevard Towers fit-out.
IOI Central Boulevard Towers at a glance
- Type
- Office
- Developer
- IOI Properties (listed in our project file, not officially confirmed)
- Area
- CBD
- Region
- Central
- Address (as listed)
- Central Boulevard / Raffles Quay
This project is not marked officially confirmed in our project file. Unit counts, tenure and dates from third-party or unverified sources have been left blank until they can be cited from the developer, HDB, URA or another official source.
Facts from the sources listed at the end of this page.
Planning your IOI Central Boulevard Towers interior
This page is for office fit-out, not for home renovation. In a CBD tower that is already completed, the usual brief is a reception or pantry joinery run, workstation storage, a meeting-room wall, and a pantry or copy-room cabinet line, designed to the approved floor plate and the landlord’s fit-out manual. Maison specifies built-in carpentry for those interiors, not loose, flat-pack furniture, and we can work in a wide floor view or in closer studies of a reception desk or a pantry run. We have no official floor plate on file and will not invent a typical tower typologies mix or a headcount.
Keppel South Central, Newport Tower and 39 Robinson Road are nearby office or central links; Shaw Tower, already live, is another. They are not a typologies reference for this building. We will not invent walking times to Raffles Place or to the waterfront, and we will not treat 2026 leasing news as a construction milestone.
After access is agreed, record handover conditions, freeze the layout, obtain landlord consent and any fire-safety or workplace approvals that the scope requires, then fabricate. A moderate office joinery scope is often planned at about six to ten weeks on site after approvals; that is an editorial allowance, not a guarantee, and a multi-floor workplace can take longer. WhatsApp Maison with your floor plate and fit-out manual when you have them. We are not affiliated with IOI Properties.
Planning your IOI Central Boulevard Towers fit-out
Handover check
- Ask the landlord for the handover condition in writing and walk the space against it.
- Check ceilings, raised floors, air-conditioning outlets, sprinkler heads, power and data provisions.
- Photograph existing marks and defects before your contractor starts.
- Agree how and when landlord defects will be fixed so they do not hold up the fit-out.
Rules and approvals
- The building's fit-out guidelines: approved contractors, insurance, deposits, hours and drawing submissions.
- Changes to sprinklers, fire alarms or escape routes usually need a qualified person and SCDF approval.
- Structural changes need BCA approval. If your use differs from the approved use, check URA's change-of-use rules.
Rules change, so we check the current version for your unit before we quote. Full office fit-out guide
From handover to opening
- 01
Brief and layout 2 to 4 weeks
Headcount, layout options, 3D views and an itemised quotation.
- 02
Submissions 2 to 6 weeks
Landlord drawings, and fire safety plans if needed.
- 03
Build 4 to 8 weeks
Partitions, ceilings, M&E, flooring and joinery.
- 04
Handover 1 to 2 weeks
Furniture, IT setup, defects and move-in.
IOI Central Boulevard Towers fit-out FAQ
Is the completion or opening date for IOI Central Boulevard Towers confirmed?
Not in our project file. This project is not officially confirmed, so figures from third-party reports have been left blank. Use your lease or the official documents.
Do you have a floor plan for IOI Central Boulevard Towers?
No official floor plan or tenancy / floor-plate drawing is on file for this page, so none is published here. Please send your approved tenancy or office plan.
Is this a home-renovation page?
No. The copy is angled at shop, office or F&B fit-out. Send a tenancy plan and permitted trade, not a residential brief, unless you actually have a home in a related development — in which case use that development’s own page.
What should I send Maison?
Your tenancy or floor-plate plan, permitted use, and any landlord fit-out manual or access date. WhatsApp us at https://wa.me/6593391185.
Sources
Facts checked against the sources on file, 11 November 2026.
Maison Interior Design is an independent interior design firm. We are not appointed by, or affiliated with, the developer, HDB or the building's owner. We have not worked at IOI Central Boulevard Towers unless our portfolio says so. Concept pictures are AI-generated style concepts, not photos of a finished unit.
Nearby new launches
Keppel South Central Tanjong Pagar
Completed January 2025, not a 2026 TOP.
Read the guideOffice · AnsonNewport Tower Anson
Indicative TOP Q4 2027 for the mixed development, per CDL construction page as at 2 November 2026.
Read the guideOffice · Raffles Place39 Robinson Road Raffles Place
Year only: expected 2026, as reported by EdgeProp.
Read the guideTalk to Maison
Planning your IOI Central Boulevard Towers fit-out?
WhatsApp Maison
WhatsApp Maison with your tenancy or floor-plate plan, permitted use, and any landlord fit-out manual or access date.