Retail · Lentor · North-East region
Lentor Modern mall Fit-Out & Interior Design
Lentor Modern mall is the retail podium of the Lentor Modern mixed development in District 26, integrated with Lentor MRT, as recorded in our project file. GuocoLand is the developer. A developer press release dated 6 January 2026, as cited in the file, says the mall is now open, with a floor area of 90,000 sq ft, and names Cold Storage Fresh and Mulberry Learning as anchors. This page covers the retail component only. The file also records 605 residential units above, fully sold; residential TOP is not tracked here and should not be counted again as a separate development. This page sets out what is on file and how to plan your Lentor Modern mall fit-out.
Lentor Modern mall at a glance
- Type
- Retail
- Developer
- GuocoLand
- Opening
- Mall opened, per developer press release dated 6 January 2026. Floor area 90,000 sq ft; anchors named as Cold Storage Fresh and Mulberry Learning
- Area
- Lentor (D26)
- Region
- North-East
- Address
- Lentor Modern (integrated with Lentor MRT)
Facts from the sources listed at the end of this page.
Planning your Lentor Modern mall interior
Because the mall is already open, the useful conversation with Maison is a shop, services or F&B fit-out, not a home renovation. A new or incoming tenant typically needs a shopfront and signage that the landlord will accept, fitted joinery for display and storage, a counter or checkout run, and a back-of-house cabinet line that can take stock, bags and cleaning. Food trades have a different services brief — extraction, grease, water and electrical load — and should not be designed from a generic lifestyle-shop layout. Maison specifies built-in carpentry for those interiors, not loose, flat-pack fixtures, and we will work from your tenancy plan, permitted trade and the landlord’s fit-out manual, not from a guessed shop size. No official tenancy floor plan is on file for this pack.
Lentor Gardens Residences, packed earlier, is a nearby residential page in District 26 and is not a typologies or lease reference for a mall unit. We will not invent walking times beyond the file’s note that the mall is integrated with Lentor MRT, and we will not imply that every unit has the same frontage or the same services.
After a lease is in hand, the sober order is: record handover defects, freeze a layout against the approved tenancy plan, obtain landlord consent and any trade-specific or fire-safety approvals, then fabricate. A modest non-food shop fit-out is often planned at about six to ten weeks on site after access and approvals; that is an editorial allowance, not a guarantee, and food or services-heavy work can take longer. WhatsApp Maison with your tenancy plan and permitted trade. We are not affiliated with GuocoLand or with the named anchors.
Planning your Lentor Modern mall fit-out
Handover check
- Ask the landlord for the handover condition in writing and walk the unit against it.
- Check the shopfront, floor, ceiling, power supply, water and drainage points, and any exhaust provision.
- Photograph existing marks and defects before work starts.
- Agree how landlord defects will be fixed so they do not delay opening.
Rules and approvals
- The landlord's fit-out guidelines: contractors, hours, deposits, signage and drawing submissions.
- Food businesses need the right SFA licence; plan the kitchen with it in mind.
- Fire safety changes need a qualified person and SCDF approval; structural changes need BCA approval.
Rules change, so we check the current version for your unit before we quote. Full retail shop fit-out guide
From handover to opening
- 01
Design and quotation 2 to 4 weeks
Layout, 3D views, materials and an itemised quotation.
- 02
Landlord approval 1 to 4 weeks
Drawing submission, plus licences for food businesses.
- 03
Build 3 to 6 weeks
Shopfront, M&E, flooring, counters and fixtures.
- 04
Fit and open 1 week
Signage, final checks, stock and opening.
Lentor Modern mall fit-out FAQ
Is Lentor Modern mall already open?
Our project file records: 2026-01 opened (developer release 6 Jan 2026). Check your own lease and landlord handover for unit access. This is not a home key-collection date.
Do you have a floor plan for Lentor Modern mall?
No official floor plan or tenancy / floor-plate drawing is on file for this page, so none is published here. Please send your approved tenancy or office plan.
Is this a home-renovation page?
No. The copy is angled at shop, office or F&B fit-out. Send a tenancy plan and permitted trade, not a residential brief, unless you actually have a home in a related development — in which case use that development’s own page.
What should I send Maison?
Your tenancy or floor-plate plan, permitted use, and any landlord fit-out manual or access date. WhatsApp us at https://wa.me/6593391185.
Sources
Facts checked against the sources on file, 11 November 2026.
Maison Interior Design is an independent interior design firm. We are not appointed by, or affiliated with, the developer, HDB or the building's owner. We have not worked at Lentor Modern mall unless our portfolio says so. Concept pictures are AI-generated style concepts, not photos of a finished unit.
Nearby new launches
Hougang Central mixed-use development Hougang
Renovation planning notes for new owners.
Read the guideOffice · PunggolOCBC Punggol Punggol
Completion targeted 1Q 2027, per an OCBC release dated September 2024.
Read the guideOffice · Raffles Place39 Robinson Road Raffles Place
Year only: expected 2026, as reported by EdgeProp.
Read the guideTalk to Maison
Planning your Lentor Modern mall fit-out?
WhatsApp Maison
WhatsApp Maison with your tenancy or floor-plate plan, permitted use, and any landlord fit-out manual or access date.