Office · Punggol · North-East region
OCBC Punggol Fit-Out & Interior Design
OCBC Punggol is recorded in our project file as an OCBC workplace in JTC’s Punggol Digital District, at 98 Punggol Way. An OCBC release dated September 2024, as cited in the file, describes a 430,000 sq ft innovation hub over eight floors of a 12-storey mixed-use tower, with a 200-room hotel and retail, and a completion targeted in the first quarter of 2027. The file also notes that this is an owner-occupied office, not a multi-tenant lease-up, and that the date comes from a 2024 official release that was not reconfirmed in 2026. We therefore treat the first-quarter 2027 target as a recorded expectation, not as a date reconfirmed this year. This page sets out what is on file and how to plan your OCBC Punggol fit-out.
OCBC Punggol at a glance
- Type
- Office
- Developer
- OCBC (in JTC Punggol Digital District)
- Launch / TOP / key date
- Completion targeted 1Q 2027, per an OCBC release dated September 2024. That date was not reconfirmed in our 2026 file, so it is a recorded expectation, not a date reconfirmed this year
- Area
- Punggol
- Region
- North-East
- Address
- 98 Punggol Way
Facts from the sources listed at the end of this page.
Planning your OCBC Punggol interior
This page is not a home-renovation brief, and it is not a claim that Maison has an appointment on OCBC’s own floors. Owner-occupied workplace interiors are usually specified by the occupier. Where a separate hotel, retail or F&B operator later has its own unit in the mixed-use tower, the useful conversation with Maison is a shop or F&B fit-out: shopfront joinery, a counter, display and storage, and a back-of-house run, designed from that operator’s tenancy plan and permitted trade, not from the office floor plate. We will not invent a retail typologies list, a hotel interior, or a typical shop size, and no official plan is on file.
Matilda Riverside, packed earlier in Punggol, is a nearby HDB page and is not a workplace typologies reference. We will not invent walking times to Punggol Digital District or to any MRT station, and we will not treat a 2024 completion target as a confirmed 2027 opening day.
Operators who do secure a unit should work from their own lease, the landlord’s fit-out rules, and the approvals that the trade requires. A modest non-food shop fit-out is often planned at about six to ten weeks on site after access and approvals; that is an editorial allowance only. WhatsApp Maison with a tenancy plan if you have one. We are not affiliated with OCBC or JTC.
Planning your OCBC Punggol fit-out
Handover check
- Ask the landlord for the handover condition in writing and walk the space against it.
- Check ceilings, raised floors, air-conditioning outlets, sprinkler heads, power and data provisions.
- Photograph existing marks and defects before your contractor starts.
- Agree how and when landlord defects will be fixed so they do not hold up the fit-out.
Rules and approvals
- The building's fit-out guidelines: approved contractors, insurance, deposits, hours and drawing submissions.
- Changes to sprinklers, fire alarms or escape routes usually need a qualified person and SCDF approval.
- Structural changes need BCA approval. If your use differs from the approved use, check URA's change-of-use rules.
Rules change, so we check the current version for your unit before we quote. Full office fit-out guide
From handover to opening
- 01
Brief and layout 2 to 4 weeks
Headcount, layout options, 3D views and an itemised quotation.
- 02
Submissions 2 to 6 weeks
Landlord drawings, and fire safety plans if needed.
- 03
Build 4 to 8 weeks
Partitions, ceilings, M&E, flooring and joinery.
- 04
Handover 1 to 2 weeks
Furniture, IT setup, defects and move-in.
OCBC Punggol fit-out FAQ
Is the 2027 completion confirmed?
Our file records a first-quarter 2027 target from a September 2024 OCBC release. That date was not reconfirmed in our 2026 file, so it is a recorded expectation only. The workplace is recorded as owner-occupied, not a lease-up.
Do you have a floor plan for OCBC Punggol?
No official floor plan or tenancy / floor-plate drawing is on file for this page, so none is published here. Please send your approved tenancy or office plan.
Is this a home-renovation page?
No. The copy is angled at shop, office or F&B fit-out. Send a tenancy plan and permitted trade, not a residential brief, unless you actually have a home in a related development — in which case use that development’s own page.
What should I send Maison?
Your tenancy or floor-plate plan, permitted use, and any landlord fit-out manual or access date. WhatsApp us at https://wa.me/6593391185.
Sources
Facts checked against the sources on file, 11 November 2026.
Maison Interior Design is an independent interior design firm. We are not appointed by, or affiliated with, the developer, HDB or the building's owner. We have not worked at OCBC Punggol unless our portfolio says so. Concept pictures are AI-generated style concepts, not photos of a finished unit.
Nearby new launches
Hougang Central mixed-use development Hougang
Renovation planning notes for new owners.
Read the guideRetail · LentorLentor Modern mall Lentor
Mall opened, per developer press release dated 6 January 2026.
Read the guideOffice · Raffles Place39 Robinson Road Raffles Place
Year only: expected 2026, as reported by EdgeProp.
Read the guideTalk to Maison
Planning your OCBC Punggol fit-out?
WhatsApp Maison
WhatsApp Maison with your tenancy or floor-plate plan, permitted use, and any landlord fit-out manual or access date.