HDB flat · Farrer Park · Central region
Farrer Park Arena Renovation & Interior Design
Farrer Park Arena is an HDB project in Kallang/Whampoa, in the Farrer Park area. A third-party completion estimate is on file, but this entry is not officially confirmed. HDB has not verified a project-wide key date, and tracker sources have disagreed on the month, so unit counts and any estimated month are left out of the facts below. The word “Arena” is not treated as a confirmed view or typologies feature. If you have a key-appointment letter, that is the date that matters. This page sets out what is on file and how to plan your Farrer Park Arena renovation.
Farrer Park Arena at a glance
- Type
- HDB flat
- Developer
- HDB (listed in our project file, not officially confirmed)
- Area
- Farrer Park (Kallang/Whampoa)
- Region
- Central
This project is not marked officially confirmed in our project file. Unit counts, tenure and completion or key dates from third-party trackers have been left blank until they can be cited from HDB.
Facts from the sources listed at the end of this page.
Planning your Farrer Park Arena interior
Farrer Park is a fine-grain, inner-city neighbourhood, and a new HDB home here usually has to work hard in a compact plan. The carpentry that typically does that job is a fitted kitchen, full-height wardrobes, an entry shoe cabinet, and a living-room storage wall, with a built-in desk if a common bedroom will be a study. Maison specifies built-in carpentry, photographed professionally, not IKEA-style furniture. We have no official floor plan on file and will not invent typologies or a typical Farrer Park Arena layout.
Farrer Park Fields is the other Farrer Park page in this batch and is also unconfirmed for keys; do not copy a date from one to the other. Verandah @ Kallang, Towner Residences and Kent Heights sit in the wider Kallang/Whampoa town, and Dorset Gardens is a nearby District 8 link. We will not invent walking times to Farrer Park MRT or to Little India. Check your block, facing and the HDB renovation rules before you plan blinds, a bench or any hacking, especially if the road is busy.
After keys, inspect defects, measure, and obtain the HDB renovation permit before fabrication. A moderate, non-structural carpentry scope is often planned at about six to ten weeks on site after access and approvals — an editorial allowance, not a guarantee. WhatsApp Maison with your plan and key letter if you have them. We are not affiliated with HDB.
Planning your Farrer Park Arena renovation
Defects check at handover
- Report defects within 30 days of key collection, before renovation starts (HDB move-in guide). The Defects Liability Period runs 1 year from key collection.
- Check floor and wall tiles for hollow or chipped pieces, plaster for cracks, and paint for stains.
- Test every door, window, lock, tap, floor trap, light point and power socket.
- Report through the QR code in your Welcome Kit or your project's Building Service Centre, with photos.
What the rules allow
- Use a contractor listed in HDB's Directory of Renovation Contractors; they can apply for the permit for you.
- A permit is needed for works such as removing floor finishes, raising floor levels in wet areas, or hacking or altering walls.
- For the first 3 years, toilet wall and floor finishes in a new BTO flat cannot be removed. New tiles can be overlaid.
- General works: Monday to Saturday, 9am to 6pm. Noisy works: Monday to Friday, 9am to 5pm. No works on Sundays or public holidays.
- Household shelter walls must not be hacked or drilled. Windows need a BCA-approved window contractor; air-conditioners need a BCA-trained installer.
Rules change, so we check the current version for your unit before we quote. Full bto key collection renovation guide
From keys to move-in
- 01
Before keys 4 to 8 weeks
Layout, 3D drawings and an itemised quotation, so work can start as soon as defects are reported.
- 02
Keys + first 2 weeks 1 to 2 weeks
Defects inspection and reporting, permit application, measurements on site.
- 03
Wet works and electrical 2 to 3 weeks
Tile overlays, screed or vinyl, wiring and plumbing points.
- 04
Carpentry 3 to 5 weeks
Built in the factory while wet works run on site, then installed.
- 05
Finishing 1 to 2 weeks
Painting, lights, glass, cleaning and a handover walk-through.
Farrer Park Arena renovation FAQ
Is the completion or key date for Farrer Park Arena confirmed?
Not in our project file. This project is not officially confirmed, so unit counts and tracker dates have been left blank. If you have an HDB key-appointment letter, use that.
Do you have the Farrer Park Arena floor plan?
No official floor-plan or site image is on file for this page, so none is published here. Please send your approved HDB unit plan.
Do I need an HDB renovation permit?
Yes, for the usual HDB renovation works. After keys, inspect defects, then apply for the permit with a registered contractor before carpentry is fabricated.
What should I send Maison?
Your approved floor plan, unit type if you have it, and a key date if one is already in writing. WhatsApp us at https://wa.me/6593391185.
Sources
- hdbprices.com: 2027 (third-party, not used as official confirmation)
- HDB renovation guide
- HDB move-in guide
Facts checked against the sources on file, 11 November 2026.
Maison Interior Design is an independent interior design firm. We are not appointed by, or affiliated with, the developer, HDB or the building's owner. We have not worked at Farrer Park Arena unless our portfolio says so. Concept pictures are AI-generated style concepts, not photos of a finished unit.
Nearby new launches
Farrer Park Fields Farrer Park
Renovation planning notes for new owners.
Read the guideHDB flat · KallangVerandah @ Kallang Kallang
Renovation planning notes for new owners.
Read the guide
Towner Residences Kallang/Whampoa
No project-wide key date confirmed; confirm your own HDB handover.
See the conceptsTalk to Maison
Planning your Farrer Park Arena renovation?
WhatsApp Maison
WhatsApp Maison with your unit type, approved floor plan and key date (if you have one).