Farrer Park Fields Renovation & Interior Design

Farrer Park Fields is an HDB project in Kallang/Whampoa, in the Farrer Park area. As with Farrer Park Arena, a third-party completion estimate is on file and is not officially confirmed. HDB has not verified a project-wide completion or key month, and tracker sources have disagreed, so unit counts and any estimated month are left out of the facts below. The word “Fields” is not treated as a confirmed outlook. Use your HDB key letter, if you have one, as the source of truth. This page sets out what is on file and how to plan your Farrer Park Fields renovation.

Farrer Park Fields at a glance

Type
HDB flat
Developer
HDB (listed in our project file, not officially confirmed)
Area
Farrer Park (Kallang/Whampoa)
Region
Central

This project is not marked officially confirmed in our project file. Unit counts, tenure and completion or key dates from third-party trackers have been left blank until they can be cited from HDB.

Facts from the sources listed at the end of this page.

Planning your Farrer Park Fields interior

A Farrer Park flat is usually a long-stay home in a busy, inner-city setting, which is why the first fit-out is worth doing properly rather than as a temporary arrangement of loose furniture. Maison would start, once the approved plan is in hand, with a fitted kitchen, full-height wardrobes, an entry cabinet, and a living-room joinery wall, and we can work in closer shots of materials as well as a wide room view. We do not use flat-pack furniture as the backbone of the home. No official floor plan is on file, so typologies are not listed, and we will not invent a typical Farrer Park Fields layout or copy one from Farrer Park Arena.

Towner Residences, Kent Heights and Verandah @ Kallang are the other Kallang/Whampoa pages on this site; Dorset Gardens is a nearby District 8 link. None of them is a typologies or key-date reference for this project. We will not invent walking times to Farrer Park MRT, and we will not assign a park or stadium view from the name. Check facing, road noise and the HDB renovation rules before you plan blinds or a window bench.

After keys, inspect defects and apply for the HDB renovation permit before fabrication. A moderate carpentry scope is often planned at six to ten weeks on site after approvals, as an editorial planning figure only. WhatsApp Maison with your approved plan and any key letter you have. We are not affiliated with HDB.

Planning your Farrer Park Fields renovation

Defects check at handover

  • Report defects within 30 days of key collection, before renovation starts (HDB move-in guide). The Defects Liability Period runs 1 year from key collection.
  • Check floor and wall tiles for hollow or chipped pieces, plaster for cracks, and paint for stains.
  • Test every door, window, lock, tap, floor trap, light point and power socket.
  • Report through the QR code in your Welcome Kit or your project's Building Service Centre, with photos.

What the rules allow

  • Use a contractor listed in HDB's Directory of Renovation Contractors; they can apply for the permit for you.
  • A permit is needed for works such as removing floor finishes, raising floor levels in wet areas, or hacking or altering walls.
  • For the first 3 years, toilet wall and floor finishes in a new BTO flat cannot be removed. New tiles can be overlaid.
  • General works: Monday to Saturday, 9am to 6pm. Noisy works: Monday to Friday, 9am to 5pm. No works on Sundays or public holidays.
  • Household shelter walls must not be hacked or drilled. Windows need a BCA-approved window contractor; air-conditioners need a BCA-trained installer.

Rules change, so we check the current version for your unit before we quote. Full bto key collection renovation guide

From keys to move-in

  1. 01

    Before keys 4 to 8 weeks

    Layout, 3D drawings and an itemised quotation, so work can start as soon as defects are reported.

  2. 02

    Keys + first 2 weeks 1 to 2 weeks

    Defects inspection and reporting, permit application, measurements on site.

  3. 03

    Wet works and electrical 2 to 3 weeks

    Tile overlays, screed or vinyl, wiring and plumbing points.

  4. 04

    Carpentry 3 to 5 weeks

    Built in the factory while wet works run on site, then installed.

  5. 05

    Finishing 1 to 2 weeks

    Painting, lights, glass, cleaning and a handover walk-through.

Farrer Park Fields renovation FAQ

Is the completion or key date for Farrer Park Fields confirmed?

Not in our project file. This project is not officially confirmed, so unit counts and tracker dates have been left blank. If you have an HDB key-appointment letter, use that.

Do you have the Farrer Park Fields floor plan?

No official floor-plan or site image is on file for this page, so none is published here. Please send your approved HDB unit plan.

Do I need an HDB renovation permit?

Yes, for the usual HDB renovation works. After keys, inspect defects, then apply for the permit with a registered contractor before carpentry is fabricated.

What should I send Maison?

Your approved floor plan, unit type if you have it, and a key date if one is already in writing. WhatsApp us at https://wa.me/6593391185.

Sources

Facts checked against the sources on file, 11 November 2026.

Maison Interior Design is an independent interior design firm. We are not appointed by, or affiliated with, the developer, HDB or the building's owner. We have not worked at Farrer Park Fields unless our portfolio says so. Concept pictures are AI-generated style concepts, not photos of a finished unit.

Talk to Maison

Planning your Farrer Park Fields renovation?
WhatsApp Maison

WhatsApp Maison with your unit type, approved floor plan and key date (if you have one).